PVC flooring is famous for its natural texture and warm feet, but its installation is the key to determining the service lifeーー“Three-point material seven-point installation” is not a lie. A little careless will appear from the drum, abnormal sound, deformation and other issues, need from preparation, construction to acceptance of the whole process control.
Before installation: Do three core preparations
The first is ground handling, which is the root cause of subsequent failures. Ground moisture content must be controlled within 12% , if more than the need to do first moisture-proof layer (such as brushing professional moisture-proof paint) , otherwise the floor area moisture will let the floor mildew deformation; flatness requirements with 2 meters by ruler detection error ≤2 mm, height difference is too large to use cement leveling, otherwise uneven stress on the floor will appear local loosening. Second, the floor itself pretreatment: Don't unpack immediately after the arrival of goods, placed in the room for 48-72 hours equilibrium moisture content, let the floor to adapt to the environment temperature and humidity, avoid future drastic shrinkage or expansion; screening floor box, the color, texture, defects similar to the classification, to ensure uniform color after paving, reduce visual drop. Finally, the accessories compliance: Keel to be used after drying of solid wood keel (moisture content ≤10%) , not without drying of miscellaneous wood; Insect repellents should be environmentally friendly to avoid contaminating the floor or releasing odors.
Installation: control the five key actions
First, the keel laying to be firm and horizontal: keel spacing control in 30-35 cm (shorter floor length can be reduced to 25 cm) , each keel with more than 2 expansion bolts or cement nails fixed, the surface should be planed to level, adjacent keel height difference ≤0.5 mm, keel space sprinkled with insect repellent, to avoid moths. Second, moisture-proof layer to be fully covered: first spread moisture-proof film, side keel 10 cm above, close to the wall gap, through the room can not leave a gap, to prevent the ground moisture upward penetration. Third, leave enough expansion joint: solid wood floor heat expansion and cold contraction is obvious, around the need to leave 8-15 mm expansion joint (south humidity big stay 12-15 mm, north dry stay 8-10 mm) , with wood wedge temporary fixed, prohibit direct wall. Fourth, the floor splicing to be precise: tongue and groove bite, adjacent floor seams staggered arrangement (avoid straight seam) , side oblique nail into stainless steel air nail fixed, each plate at least 2 fixed points; When paving with a small amount of environmentally friendly wood oil to enhance the sealing, reduce late seam deposition. Fifth, the special parts of the adaptation: door, pipe to be cut in advance, the edge of the neat adaptation, and ceramic tiles, stone junction installed over the bridge, buffer height difference.